Zone d'identification
Cote
JM-AIY/OttomanRegisters/Vol2/p15b/item89
Titre
Inspection of new slaughterhouse site to be conducted by municipal engineers, 31 October 1894 (Gregorian calendar) - 19 Tishrîn Awwal 1310 (Ottoman fiscal calendar (Rumi)
Date(s)
- 1894-10-31 (Production)
Niveau de description
Pièce
Étendue matérielle et support
1 item
Zone du contexte
Nom du producteur
(Early 1860s)
Histoire archivistique
Source immédiate d'acquisition ou de transfert
Zone du contenu et de la structure
Portée et contenu
It has been decided by the council that the slaughterhouse should be completed under the supervision of the engineer Ibrâhîm Effendi. For the inspection of the mentioned slaughterhouse and an estimation of what has been finished by the contractors, what it left to be done and what part of the construction done by the contractors has to be repaired, the rifatillu Mohammad Effendi, Sirûfîm Effendi and Shlomo Effendi and building master Shaykh Hâmid and Jiryîs Al Zanânîrî have been elected in order to conduct the mentioned inspection. Accordingly, this decision was taken on the 19th of Tishrîn Awal (1)310 (31rd of October 1894).
[4 signatures]
Évaluation, élimination et calendrier de conservation
Accroissements
Mode de classement
Zone des conditions d'accès et d'utilisation
Conditions d'accès
Conditions de reproduction
Langue des documents
arabe