Bereich "Identifikation"
Signatur
JM-AIY/OttomanRegisters/Vol10/p33b/item181
Titel
Upon a letter of the Directorate of Ottoman Lands regarding the cost estimated for the construction expenses of the mosque to be newly constructed, 28 February 1905 (Gregorian calendar) - 15 Shubât 1320 (Ottoman fiscal calendar (Rumi)
Datum/Laufzeit
- 1905-02-28 (Anlage)
Erschließungsstufe
Objekt
Umfang und Medium
1 item
Bereich "Kontext"
Name des Bestandsbildners
(Early 1860s)
Bestandsgeschichte
Abgebende Stelle
Bereich "Inhalt und innere Ordnung"
Eingrenzung und Inhalt
Upon the letter, dated 30 January 1905 and numbered 329, by the Directorate of Ottoman Lands
24,300 piasters, the cost estimated for the construction expenses of the mosque to be newly constructed together with the school in the village of Hamidiye, has been considered appropriate; and the reparation costs of the bridge in Jericho have been put on Dutch auction, but no one showed any interest. It has been understood from the municipal engineer’s statement in the hereby presented inspection register that the amount of the determined costs is appropriate and befitting. The 15th of Shubât (1)320 (28th of February 1905).
Bewertung, Vernichtung und Terminierung
Zuwächse
Ordnung und Klassifikation
Bedingungen des Zugriffs- und Benutzungsbereichs
Benutzungsbedingungen
Reproduktionsbedingungen
In der Verzeichnungseinheit enthaltene Sprache
Osmanisch