Bereich "Identifikation"
Signatur
Titel
Datum/Laufzeit
Erschließungsstufe
Umfang und Medium
1 item
Bereich "Kontext"
Name des Bestandsbildners
Bestandsgeschichte
Abgebende Stelle
Bereich "Inhalt und innere Ordnung"
Eingrenzung und Inhalt
It has been known that a part of the slaughterhouse was built and then fell down last Friday. So, it has been decided by the committee to head for [the slaughter house] and examine it. It has become evident that it is not possible to do the construction without [using] reinforcing rods. Thus, it has been decided to do the construction with the rods and only then we can realize the difference between using the rods or not. ??? This includes what is needed from the part of the contractor or the engineer with the expenses of the construction that fell down. In order to proceed with the spending from the council treasury in accordance with the above-mentioned conditions and with the knowledge of Shlomo Effendi, this decision was recorded on the 17th of Muharram (1)311.
[3 signatures]
Bewertung, Vernichtung und Terminierung
Zuwächse
Ordnung und Klassifikation
Bedingungen des Zugriffs- und Benutzungsbereichs
Benutzungsbedingungen
Reproduktionsbedingungen
In der Verzeichnungseinheit enthaltene Sprache
Arabisch