Area dell'identificazione
Codice di riferimento
JM-AIY/OttomanRegisters/Vol4/p8a/item54
Titolo
Decision to install metal conduit for water from new cistern, 20 June 1895 (Gregorian calendar) - 8 Huzayrân 1311 (Ottoman fiscal calendar (Rumi)
Date
- 1895-06-20 (Creazione)
Livello di descrizione
Unità documentaria
Consistenza e supporto
1 item
Area del contesto
Nome del soggetto produttore
(Early 1860s)
Istituto conservatore
Storia archivistica
Modalità di acquisizione
Area del contenuto e della struttura
Ambito e contenuto
Since the council has found it to be urgent to do a lead canal from the new water cistern up to the pool next to al-mu’aras with repairing of al-tûbah?. Accordingly, it has been decided on the council level to do it by proxy with the knowledge of one of us, the respectable al-Hâj Hasan Effendi and to keep a log of expenses with details. Accordingly, this decision was taken on the 8th of Huzayrân (1)311 (20th of June 1895).
[6 signatures]
Valutazione e scarto
Incrementi
Sistema di ordinamento
Area delle condizioni di accesso e uso
Condizioni di accesso
Condizioni di riproduzione
Lingua dei materiali
arabo