Zone d'identification
Cote
JM-AIY/OttomanRegisters/Vol4/p8a/item54
Titre
Decision to install metal conduit for water from new cistern, 20 June 1895 (Gregorian calendar) - 8 Huzayrân 1311 (Ottoman fiscal calendar (Rumi)
Date(s)
- 1895-06-20 (Production)
Niveau de description
Pièce
Étendue matérielle et support
1 item
Zone du contexte
Nom du producteur
(Early 1860s)
Histoire archivistique
Source immédiate d'acquisition ou de transfert
Zone du contenu et de la structure
Portée et contenu
Since the council has found it to be urgent to do a lead canal from the new water cistern up to the pool next to al-mu’aras with repairing of al-tûbah?. Accordingly, it has been decided on the council level to do it by proxy with the knowledge of one of us, the respectable al-Hâj Hasan Effendi and to keep a log of expenses with details. Accordingly, this decision was taken on the 8th of Huzayrân (1)311 (20th of June 1895).
[6 signatures]
Évaluation, élimination et calendrier de conservation
Accroissements
Mode de classement
Zone des conditions d'accès et d'utilisation
Conditions d'accès
Conditions de reproduction
Langue des documents
arabe