Area dell'identificazione
Codice di riferimento
JM-AIY/OttomanRegisters/Vol3/p34a/item245
Titolo
About reporting a building construction, 19 April 1899 (Gregorian calendar) - 7 Nîsân 1315 (Ottoman fiscal calendar (Rumi)
Date
- 1899-04-19 (Creazione)
Livello di descrizione
Unità documentaria
Consistenza e supporto
1 item
Area del contesto
Nome del soggetto produttore
(Early 1860s)
Istituto conservatore
Storia archivistica
Modalità di acquisizione
Area del contenuto e della struttura
Ambito e contenuto
In accordance with the 53. article of the Public Buildings Regulation in effect as regards this matter, it is necessary to receive a surety bond from the person who requests any building construction to be stopped and to report to the building owner that the construction has been stopped for 15 days. Since the necessary surety bond has been received, it is necessary to send an official letter to the Armenian Patriarchate to report that the construction being done in the west side shall be stopped from the beginning of the date written below. The 7th of Nîsân (1)315 (19th of April 1899).
[No signatures]
Valutazione e scarto
Incrementi
Sistema di ordinamento
Area delle condizioni di accesso e uso
Condizioni di accesso
Condizioni di riproduzione
Lingua dei materiali
turco ottomano