The report given by the engineer Effendi reveals that the road has been trespassed upon while carrying out infrastructure work of the wall, for which a license was given to the Armenian Monastery to construct it outside the gate of Seyyidinâ Dâvûd (Peace be upon him) gate. Although the engineer told that the work must be carried out in accordance with the license, this warning was disregarded. It is thus appropriate to notify the Armenian Patriarchate that the said wall must be constructed in line with the given license, and that the construction work shall be stopped and the existing structure demolished if acted incongruously. The 20th of Huzayrân (1)314 (2nd of July 1898).
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
- Ottoman Turkish