Area dell'identificazione
Codice di riferimento
JM-AIY/OttomanRegisters/Vol6/p8b/item53
Titolo
Issue regarding construction work, 2 July 1898 (Gregorian calendar) - 20 Huzayrân 1314 (Ottoman fiscal calendar (Rumi)
Date
- 1898-07-02 (Creazione)
Livello di descrizione
Unità documentaria
Consistenza e supporto
1 item
Area del contesto
Nome del soggetto produttore
(Early 1860s)
Istituto conservatore
Storia archivistica
Modalità di acquisizione
Area del contenuto e della struttura
Ambito e contenuto
The report given by the engineer Effendi reveals that the road has been trespassed upon while carrying out infrastructure work of the wall, for which a license was given to the Armenian Monastery to construct it outside the gate of Seyyidinâ Dâvûd (Peace be upon him) gate. Although the engineer told that the work must be carried out in accordance with the license, this warning was disregarded. It is thus appropriate to notify the Armenian Patriarchate that the said wall must be constructed in line with the given license, and that the construction work shall be stopped and the existing structure demolished if acted incongruously. The 20th of Huzayrân (1)314 (2nd of July 1898).
Valutazione e scarto
Incrementi
Sistema di ordinamento
Area delle condizioni di accesso e uso
Condizioni di accesso
Condizioni di riproduzione
Lingua dei materiali
- turco ottomano