Affichage de 5680 résultats

Description archivistique
Jerusalem City Archives (AIY)
Options de recherche avancée
Aperçu avant impression Affichage :

335 résultats avec objets numériques Afficher les résultats avec des objets numériques

Problems with slaughterhouse construction, 31 July 1893 (Gregorian calendar) - 17 muharram 1311 (Ottoman fiscal calendar (Rumi)

It has been known that a part of the slaughterhouse was built and then fell down last Friday. So, it has been decided by the committee to head for [the slaughter house] and examine it. It has become evident that it is not possible to do the construction without [using] reinforcing rods. Thus, it has been decided to do the construction with the rods and only then we can realize the difference between using the rods or not. ??? This includes what is needed from the part of the contractor or the engineer with the expenses of the construction that fell down. In order to proceed with the spending from the council treasury in accordance with the above-mentioned conditions and with the knowledge of Shlomo Effendi, this decision was recorded on the 17th of Muharram (1)311.
[3 signatures]

Meeting of the Municipal Council (Decisions of the Committee on the evacuation of al-Samsuniyyah land) - 1966-04-26; 1966-05-01; 1966-05-03

Attendance:
Ruhi al-Khatib (mayor,
chair),
‘Abd al-Mughni al-Natsheh,
Musa al-Bittar,
Zaki al-Ghoul,
Khader Abu Swai,
Anton Safieh (mayor’s assistant),
Omar al-Wa’ari (municipality lawyer),
Yusif al-Budairi (city engineer)

Topics:
Discussion on the evacuation of al-Samsuniyyah land - pp. 1-3

Résultats 5671 à 5680 sur 5680