Item JM-AIY/OttomanRegisters/Vol3/p33a/item234 - Inspector’s Report: Street repair works in and outside of Old City incomplete, 12 April 1899 (Gregorian calendar) - 31 Mârt 1315 (Ottoman fiscal calendar (Rumi)

Identity area

Reference code

JM-AIY/OttomanRegisters/Vol3/p33a/item234

Title

Inspector’s Report: Street repair works in and outside of Old City incomplete, 12 April 1899 (Gregorian calendar) - 31 Mârt 1315 (Ottoman fiscal calendar (Rumi)

Date(s)

  • 1899-04-12 (Creation)

Level of description

Item

Extent and medium

1 item

Context area

Name of creator

Archival history

Immediate source of acquisition or transfer

Content and structure area

Scope and content

In accordance with the requests presented by the contractors for repair and improvement of the roads in and outside of Old City, an inspection has been done by the municipal engineer and the commissioner of the railway train on the road[s] contracted by 'Isâ al-Qassîs, Sam'ân al-Zanânîrî, Hannâ 'Ilyâs al-Zanânîrî and 'Atallah Sulaymân al-Skâfî; namely the road leading from the outset of Shu'ab al-Ramthâwî Shihâb to outside of Damascus Gate next to the headquarters of the glorified government, [the road] leading from the Austrian Hospital to outside of Lion’s Gate, [the road] leading from Fast Hotel belonging to the municipality to Hajja pool, the road leading from the French Hospital to the house of Hasan Bik, the road leading from Jaffa road to the road of 'Ukâshah and the road leading from Jaffa road to Schneller School. And, it has been found from the presented inspection dated on the 6th of Shubât (1)314, that it is urgent to complete certain repairs which are to be subtracted from the recurrent prices of the contracting as much as incomplete amounts of pebbles, dust and others in accordance with the conditions written in the records of contracting.
Previously, an inspection was done by one of us the respectable Qîta Effendi, the respectable Na'ûmî Effendi and the [municipal] engineer on the road contracted to Ilyâs Abû Slîh, namely the road leading from Jaffa Gate to the municipal Hospital. It has been found according to the [above] inspection dated on the 30th of Kanûn Awwal (1)314, that is urgent to do some repairs. Since the directions were repeatedly and uselessly announced to the mentioned contactors from the part of municipality presidency and with the knowledge of the contract's scribe, it has been decided by the council to nominate one of us the respectable al-Hâj Bakr Effendi, the respectable Na'ûmi Effendî and the [municipal] engineer to complete what is needed by proxy on the account of the contractors. In order for this to be approved, this decision was taken on the 31st of Mârt (1)315 (12th of April 1899).
[5 signatures]

Appraisal, destruction and scheduling

Accruals

System of arrangement

Conditions of access and use area

Conditions governing access

Conditions governing reproduction

Language of material

  • Arabic

Script of material

    Language and script notes

    Physical characteristics and technical requirements

    Finding aids

    Allied materials area

    Existence and location of originals

    Existence and location of copies

    Related units of description

    Related descriptions

    Notes area

    Alternative identifier(s)

    Access points

    Subject access points

    Place access points

    Name access points

    Genre access points

    Description control area

    Description identifier

    Institution identifier

    Rules and/or conventions used

    Status

    Level of detail

    Dates of creation revision deletion

    Language(s)

      Script(s)

        Sources

        Accession area